![]() |
|
RIBBLEHEAD - 25th September 2000 60041 has its load discharged in the siding at Ribblehead having arrived from Shap. The siding was temporarily used for ballast storage in connection with track relaying during the following November. It formerly ran into Ribblehead Quarry. |
|
|
|
|
Photograph copyright © Kevin Law 2003 - all rights reserved |
||